Modernization of Crane Equipment and Supply of a Crane Runway for a Metallurgical Facility

For our client, who specializes in the processing of semi-finished and finished metallurgical products, we successfully carried out a complete modification and expansion of their crane equipment in cooperation with a construction company. The entire installation and system commissioning took place in a newly renovated hall between March and May 2026.

A key part of the reconstruction was the complete design and supply of a new crane runway. It was engineered to provide sufficient load capacity for a newly delivered crane with a capacity of 12.5 tonnes. We installed this new overhead crane, fitted with our unique patented bridge girder, on the newly constructed runway to the customer's full satisfaction.

The new 12.5 t crane will operate along the crane runway alongside an older, but still fully functional, 5 t capacity crane. Despite its age, the older 5 t crane did not require any extensive repairs. Since both cranes share a single runway, only a necessary replacement of its travel wheels was carried out to ensure full compatibility with the new crane rail.

At Adamec Crane Systems, we use only the highest quality components from our own production during manufacturing and assembly, supplemented by top-tier parts from proven suppliers such as Stahl CraneSystems or Lenze. Thanks to this proven combination, we can guarantee that the supplied cranes will reliably serve in demanding operations for at least several decades to come.

Modernization of Crane Equipment and Supply of a Crane Runway for a Metallurgical Facility